Skip to main content

Mark Footing Locations and Square the Deck — Layout and Excavate Footings

Intermediate4 mins

Part of project

Deck Construction · Step 3 of 13

Helpful?

In this video

With the ground leveled, the next step is to accurately mark the locations for the deck's footings. This involves re-establishing precise perimeter lines using the batter boards and string lines, ensuring the deck will be square to the house. The '3-4-5 method' (or a scaled version like 9-12-15 feet for larger decks) is used to verify squareness by measuring the diagonal. Once the perimeter is confirmed, individual footing locations are marked, typically 16 inches away from the house and spaced at approximately 4.5-foot intervals along the beams. These marks guide the placement of the auger for drilling. Before any digging commences, it's essential to call 811 to locate underground utilities.

1.6M views10.9K

FAQs

How difficult is building a deck, and how much time should I realistically expect it to take?

Building a deck is an intermediate to advanced DIY project that requires careful planning and precision. While individual tasks vary, a complete deck build can easily take several weekends or even weeks, depending on the size, complexity, and your experience level. Don't underestimate the time needed for planning, permits, and inspections.

Why are permits and local building codes so important for deck construction?

Permits ensure your deck meets safety standards and local building regulations, preventing potential fines and ensuring structural integrity. Local codes dictate crucial aspects like footing depth, span lengths for beams and joists, fastener types, and railing height. Always check with your local municipality before starting any work to avoid costly rework or safety hazards.

What specialized tools will I need beyond basic hand tools for building a deck?

Beyond common tools like a measuring tape, pencil, and level, you'll need specialized equipment such as a post hole digger for footings and a power saw for cutting lumber accurately. A decking tool, like the Plank Rite Decking Tool mentioned, can be very helpful for consistent board spacing. Consider renting larger tools for efficiency.

What are some common mistakes beginners make that compromise deck safety and longevity?

A major mistake is neglecting proper footing depth and size, which can lead to settling and instability. Another common error is improperly attaching the ledger board to the house or failing to use appropriate fasteners, which can cause catastrophic structural failure. Always ensure all connections meet local code requirements and are securely fastened to carry the intended load.

Transcript
Hide

very easy to use and straightforward so now that we have all of our lines taken care of and aligned we have to determine making sure that the deck itself is square against the house and one of the key aspects of a deck is making sure it's square off the house so we're using the three four five method but we're actually going to be making it and times in it by three because it's such a large deck so if you take three times three from here to here is nine feet three times four twelve so take that measurement from here over to here is twelve feet off of that mark and of course three times five is fifteen so if i take my tape measure i'll try to do it by hand and we'll run it all the way across you wanna make sure that that line is very close to 15. if it is that means you have a perfectly square deck off of the house which is exactly what we want at this point i position a stake 16 inches away from the house as well as insert a screw on our batter board at 16 inches also then tie a string line and guess what we have the center of our beam okay so we now have our perimeter line taken care of as well as our footing lines now these specific lines are basically showing exactly where the center of our beam is going to be going now we have to determine every single location for the footing itself across each beam so it's properly supported for the joists that are going to be going above it easy enough right but then we get to get to drilling that'll be fun for any type of structural project like this you should take a look at what your local structural requirements should be for joist spans and beam sizes that are needed for footing placements because we don't have a lot of space to work with we're going to be going with a 4x6 beam which i'd actually normally be

Auto-generated transcript. May contain errors.